At a glance:
Client: Esquire Developments | Location: St Mary Hoo, Rochester | Scope: 43 home Development | Construction: Winder and Straight Flights | Timber: Engineered Pine and Oak | Accreditations: ISO 9001, ISO 14001, FSC certified, FORS Bronze
Client: Esquire Developments | Location: St Mary Hoo, Rochester | Scope: 43 home Development | Construction: Winder and Straight Flights | Timber: Engineered Pine and Oak | Accreditations: ISO 9001, ISO 14001, FSC certified, FORS Bronze
Multi-Turn designed, manufactured and delivered timber staircases across all 43 plots of Esquire Developments’ new-build Fenn Bell project in St. Mary Hoo, Rochester. The project included a mixture of quarter-turn winder staircases and straight flights with a wall-mounted rail.
Esquire Developments needed a single timber staircase supplier for their 43-plot development, Fenn Bell. The brief called for design specs that could flex to suit each house type, but remained consistent from one plot to another. Once the design was signed off, the staircases needed to be delivered against a rolling programme that wouldn’t hold up second fix or other trades on any home.
Every staircase on the development shares the same core specification, adjusted plot by plot to fit the house type it serves.
Each staircase on this development was built through Staircase Success. This is a three-stage process for taking a staircase from brief to a fitted, snag-free flight.
01 — PROPOSAL
Our Project Managers worked from Esquire’s house-type drawings to turn each floor plan into a manufacture-ready specification, sharing consistent materials and finish across the range.
02 — PLAN
Dimensions and a Building Regulations compliance check were confirmed for each house type and locked in before manufacture began.
03 — SERVICE
Staircases were manufactured, dry-assembled and quality-checked in our factory, then delivered when Esquire requested them, working towards our Fit-First-Time commitment.
Esquire’s Site Manager said deliveries arrived as planned and helped maintain the build programme, describing the quality and finish as very good.
Stuart Boakes
Site Manager, Esquire Developments Ltd
On-site carpenter
On fitting the staircases at Fenn Bell
Take a look at the Fenn Bell site and finished staircases below:
Talk to our team about your programme, house types and delivery schedule. We’ll show you how Staircase Success and Fit-First-Time will work across your development.
Every staircase is built to one agreed specification under our Staircase Success process and dry-assembled before it leaves our factory. Backed by ISO 9001 accreditation, that keeps the standard on plot one the same as the last, and the same on every site you run with us.
Yes. Each staircase can be specified to suit its own house type, for example a quarter-turn winder for one and a straight flight with a wall-mounted rail for another, while shared timber, detailing and finish keep the whole site consistent.
Staircases are delivered as and when the site requests them, plot by plot against the build programme rather than in one bulk drop, so second fix isn’t held up by a delivery meant for another plot. Find out more about our staircases for large-scale developments.
Our Fit-First-Time commitment means we measure precisely and check Building Regulations compliance before manufacture, then dry-assemble every staircase in our factory before delivery, so any fitting problem is caught there, not on site.
Part K covers stairs, handrails and guarding, including rise, going and headroom, and Approved Document K gives the guidance for meeting it in England. We check each design against it before manufacture and flag any issue, with a recommended fix, before the staircase reaches site. Read our staircase Building Regulations guidance.
Yes. Multi-Turn is a timber staircase manufacturer based in Winchester, supplying housebuilders and developers UK-wide, backed by FORS bronze accreditation for the fleet that gets each staircase to site. For example, we supplied all 40 plots at Fenn Bell, near Rochester in Kent.