What was Esquire Development’s brief for the Fenn Bell staircases?


Esquire Developments needed a single timber staircase supplier for their 43-plot development, Fenn Bell. The brief called for design specs that could flex to suit each house type, but remained consistent from one plot to another. Once the design was signed off, the staircases needed to be delivered against a rolling programme that wouldn’t hold up second fix or other trades on any home.

What did Multi-Turn design and manufacture for Esquire Developments at Fenn Bell?

Every staircase on the development shares the same core specification, adjusted plot by plot to fit the house type it serves.

Engineered pine and ply construction

Primed engineered pine strings and ply risers as the standard build across every plot, ready for carpeting and finishing.

Oak handrail and newel caps

An oak handrail and pyramid newel caps used as the consistent detail across the whole development.

Winder & straight-flight configurations

Some house types use a quarter-turn winder staircase with a bullnose feature step, while others use a straight flight with a wall-mounted oak rail.

White-primed balustrade

Spindles and baserails were primed to the same standard plot by plot, ready for the development’s own finish.

Bronze stair protection

Every staircase was protected through second fix with our bronze tier, so the finish specified for handover was the finish that reached site.

Why specify per house type?

A multi-plot development needs a flexible staircase design, not one design forced across all of them. The same material and finish keep the site reading as one consistent standard.

housing development in Kent

How did Multi-Turn keep the 43 plots at Fenn Bell on programme?


Each staircase on this development was built through Staircase Success. This is a three-stage process for taking a staircase from brief to a fitted, snag-free flight.

01 — PROPOSAL

Our Project Managers worked from Esquire’s house-type drawings to turn each floor plan into a manufacture-ready specification, sharing consistent materials and finish across the range.

02 — PLAN

Dimensions and a Building Regulations compliance check were confirmed for each house type and locked in before manufacture began.

03 — SERVICE

Staircases were manufactured, dry-assembled and quality-checked in our factory, then delivered when Esquire requested them, working towards our Fit-First-Time commitment.


What was the result?

Esquire’s Site Manager said deliveries arrived as planned and helped maintain the build programme, describing the quality and finish as very good.


“Delivery was always good and reliable throughout the project. Deliveries arrived as planned and helped us maintain our programme.”

“The quality and finish were very good — the carpenter was always happy, which is a bonus.”

Stuart Boakes

Site Manager, Esquire Developments Ltd


“They’re great. I’d fit them all day long if I could.”

On-site carpenter

On fitting the staircases at Fenn Bell


 

The finished homes and staircases

Take a look at the Fenn Bell site and finished staircases below:

oak handrail and newel caps

Oak handrails and newel caps

winder stairs

Painted and carpeted softwood winder

carpeted bullnose feature step

Bullnose feature step

Planning staircases for your next multi-plot development?

Talk to our team about your programme, house types and delivery schedule. We’ll show you how Staircase Success and Fit-First-Time will work across your development.

FAQs

Every staircase is built to one agreed specification under our Staircase Success process and dry-assembled before it leaves our factory. Backed by ISO 9001 accreditation, that keeps the standard on plot one the same as the last, and the same on every site you run with us.

Yes. Each staircase can be specified to suit its own house type, for example a quarter-turn winder for one and a straight flight with a wall-mounted rail for another, while shared timber, detailing and finish keep the whole site consistent.

Staircases are delivered as and when the site requests them, plot by plot against the build programme rather than in one bulk drop, so second fix isn’t held up by a delivery meant for another plot. Find out more about our staircases for large-scale developments.

Our Fit-First-Time commitment means we measure precisely and check Building Regulations compliance before manufacture, then dry-assemble every staircase in our factory before delivery, so any fitting problem is caught there, not on site.

Part K covers stairs, handrails and guarding, including rise, going and headroom, and Approved Document K gives the guidance for meeting it in England. We check each design against it before manufacture and flag any issue, with a recommended fix, before the staircase reaches site. Read our staircase Building Regulations guidance.

Yes. Multi-Turn is a timber staircase manufacturer based in Winchester, supplying housebuilders and developers UK-wide, backed by FORS bronze accreditation for the fleet that gets each staircase to site. For example, we supplied all 40 plots at Fenn Bell, near Rochester in Kent.