What Happens Before a Staircase Arrives on Site

By the time a staircase arrives on site, most of the work is already complete. Surveying, design, manufacture and quality checks all happen long before delivery. The care taken at each of these stages determines whether installation stays on schedule or leads to costly adjustments and delays on site.

For developers, architects and technical teams, knowing what goes on behind the scenes shows what to look for in a staircase manufacturer. Here’s how a made to measure staircase goes from an empty stairwell to a finished product, ready to be delivered when your site is ready for it.


1. It starts with agreeing what the project needs


Every project starts with a conversation about what a successful outcome looks like. Meeting build deadlines is always a priority, alongside things like cost targets, the specification or the level of support your site team needs. Those priorities then shape every stage that follows.

“Understanding the developer’s requirements and budget is one of the most important parts of my role. From there, I can design each house type to be practical to manufacture, meet the required design criteria, ensure spec compliance, and remain within budget across the whole development.” – Archie Pester, Estimator

We also agree timelines with the site and confirm when each plot will be ready to measure. On a multi-plot development, this means each plot is surveyed at the right stage of the build, so every staircase is made to accurate measurements.



2. Measuring the building as it really is


Plans are a useful starting point, but a finished stairwell doesn’t always match the drawings. One of our surveyors will visit the site to take measurements for each staircase before any design work begins, using laser measuring tools and digital devices for precise readings.

  • The full stairwell opening
  • Distances from door swings
  • Headroom between ceilings, or between two staircases positioned above each other

Taking responsibility for the measurements ourselves means each staircase is built for the space it’s going into. You can find out more about what happens during a staircase site survey, the risks of having no site survey and how we ensure accurate fitting staircases on high volume developments.



3. Turning measurements into an approved design


Our design team uses proven formulas, backed by decades of experience, to turn the survey measurements into a detailed staircase layout. Each step is planned to be comfortable to use and in proportion with the space around it. The final drawing sets out every dimension needed to comply with UK Building Regulations.

Drawings are then sent to you for approval. This is the point for architects and technical teams to check the design against the specification. A change made on a drawing is far quicker and cheaper than one made to a finished staircase.

Decisions confirmed at this stage usually include the following.

  • Configuration and layout, so the staircase makes the best use of the space available.
  • Construction type, such as a cut string, closed string or open riser staircase, which affects both the look and the budget.
  • Timber and finish, depending on whether the staircase will be stained, painted or carpeted.
  • Balustrade design, including the handrail, spindles and newel posts.

4. Making every staircase in-house


All our staircases are manufactured at our Winchester facility. Keeping production under one roof means the same team is responsible for quality from raw timber to finished staircase. As an FSC certified supplier, we can also support developers working towards sustainability targets.

Our factory has a dedicated bespoke workshop alongside streamlined production lines. The bespoke workshop handles individual staircases with tailored details like cut string detailing, continuous handrails and feature steps. Our production lines give us the capacity to manage high-volume orders across multiple sites, while our CAD and engineering systems keep standards identical on every plot. Pre-primed and pre-assembled components can also help cut labour and installation time on site.


5. Dry assembly and quality checks


Once the components are manufactured, our expert joiners dry assemble and quality-check each staircase before it goes on the delivery vehicle.

This confirms that every element fits to the precise specification we’ve produced. Any adjustments are made in our factory, where it’s much easier to fine-tune a staircase than on a live site, as any delay there can hold up other trades. It also means your staircase is easy to fit for any qualified joiner or carpenter, in line with your build schedule. This step is at the heart of our Fit-First-Time commitment.

Those checks are backed by our ISO 9001 certified quality management system.



6. Getting your staircase ready for delivery


Delivery planning starts well before anything is loaded. Rather than delivering as soon as production is complete, we coordinate each delivery around your construction schedule, so your stairs arrive when the plot is ready for them. This also avoids the need for costly on-site storage and the risk of damage that comes with it.

Our project and logistics teams work with site managers to arrange each delivery, taking into account access restrictions, delivery slots and the current phase of work.

Parts are checked against a delivery checklist when loading and again on delivery, so nothing is missing when your fitters arrive. Smooth delivery is key to keeping your project on track, and our On Time, In Full promise means every staircase arrives complete and ready to install.

On the 43-plot Fenn Bell site in Rochester, Esquire Developments needed one supplier across the whole development, with staircases delivered against a rolling programme so second fix was never held up. We delivered plot by plot as the site requested them, rather than in one bulk drop. Esquire’s Site Manager, Stuart Boakes, said, “Deliveries arrived as planned and helped us maintain our programme.”



See the process for yourself


The best way to understand how your staircases are made is to see the process first hand. We welcome housebuilders, developers, contractors and buyers to our Winchester factory to see exactly how that happens. Tours usually last around an hour and are a useful step if you’re comparing suppliers.

If you’re planning a new build project and want a bespoke staircase manufacturer who takes responsibility from survey to delivery, get in touch to book a factory tour.